The NBS plug in to ArchiCAD went down very well at the ArchiCAD Summer School 2010 at Nottingham last week. Around 60 people attended and many then had one-to-one sessions getting more detailed demonstrations of the software in action.The main features are the ability to create annotations from NBS clauses directly from within ArchiCAD. It is then possible to report, locate and correct any broken annotations prior to issuing your documentation. A video of this in action may be viewed at:
http://constructioncode.blogspot.com/2010/05/annotating-archicad-models-from-nbs.html
The pictures below shows Simon Gilbert from Graphisoft UK demonstrating to delegates.
Thursday, 16 September 2010
Wednesday, 15 September 2010
NBS Domestic Specification – Draft Scope of Content
Following my earlier post on the upcoming online NBS Domestic Specification service, one or two of you have asked for more information about the content that will be included.
The list below is subject to change - it is currently under review.
In terms of the Contract Particulars you can choose from either
In terms of the named “NBS Domestic Specification”, this has been chosen because it has primarily designed with the expectation for use on small domestic projects. Clearly, if anyone thought this content is suitable for one of their simple, small scale, commercial refurbishment projects then they would be welcome to use the service for this.
And finally, here is a picture of an NBS specification product working on an Apple Mac :)
The list below is subject to change - it is currently under review.
In terms of the Contract Particulars you can choose from either
- JCT 2005 Minor Works Building Contract with Contractor's Design (MWD)
- JCT 2005 Minor Works Building Contract (MW)
- JCT Building Contract for a Home Owner/ Occupier who has appointed a Consultant to oversee the work (HO/C)
- JCT Building Contract for a Home Owner/Occupier who has not appointed a Consultant to oversee the work (HO/B)
- SBCC 2005 Minor Works Building Contract with Contractor's Design (MWD/Scot)
- SBCC 2005 Minor Works Building Contract (MW/Scot)
- A9 General technical requirements
- D1 Site preparation
- E1 Concrete foundations and floors
- F1 Masonry walling
- G1 Packaged frames and structural steelwork
- G2 Structural timber and general carpentry
- H2 Board and sheet external cladding and soffits
- H6 Slate and tile pitched roof coverings and cladding
- J1 Flat roof coverings
- K1 Wood internal flooring, linings and trim
- L1 Windows, roof windows and patent glazing
- L2 Doors and frames
- L3 Stairs and guarding
- M1/2 Plastering, rendering and screeding
- M4/5 Sheet and tile internal finishes
- M6 Painting, staining and varnishing
- N1 Appliances and fittings
- Q1 Landscape
- R1 Above and below ground drainage
- S9 Hot and cold water systems
- T9 Heating systems
- U9 Ventilation systems
- V9 Electrical systems
- System Outline
- Masonry walling
- 110 External cavity walling
- 115 External cavity dwarf walling
- 120 External solid walling
- 125 External masonry cladding
- 130 Internal cavity walls
- 135 Internal solid walls
- 140 Sleeper walls
- Work to existing walling
- 145 Junction with new walling
- 150 Openings in existing walling
- 155 Cavity tray and dpc insertion
- 160 Cavity insulation insertion to existing walling
- 165 Masonry walling removal
- 170 Repoint existing walling.
- Products
- Masonry units
- 302 Common bricks
- 304 Facing bricks
- 306 Reclaimed bricks
- 308 Aggregate concrete blocks
- 310 Aerated concrete blocks
- 312 Manufactured stone blocks
- 314 Natural stone rubble
- Mortars
- 316 Mortar
- Concrete
- 318 General concrete
- Wall ties
- 320 Plain wall ties
- 322 Insulation retaining wall ties
- 324 Remedial wall ties
- 326 Timber frame wall ties
- 328 Wall starters
- Cavity trays and dpcs
- 330 Flexible cavity trays
- 332 Gas retardant cavity trays
- 334 Preformed cavity trays
- 336 Preformed remedial cavity trays
- 338 Flexible dpcs
- 340 Flexible insulated dpcs
- 342 Chemical dpcs
- Cavity insulation and cavity closers
- 344 Full fill cavity insulation
- 346 Partial fill cavity insulation
- 348 Remedial cavity insulation
- 350 Plastics insulated cavity closers
- Ventilation components
- 352 Air bricks
- 354 Sub-floor ventilation ducts
- Lintels
- 356 Manufactured stone lintels
- 358 Precast concrete lintels
- 360 Proprietary metal lintels
- 362 Steel lintels
- Sills
- 364 Manufactured stone sills
- 366 Natural stone sills
- 368 Precast concrete sills
- Flashings built into masonry
- 370 Lead apron flashingsw
- 372 Lead cover flashings
- 374 Lead step and cover flashings
- Execution
- Masonry walling
- 610 Laying brickwork and blockwork
- 615 Laying rubble stonework
- 620 Laying concrete cavity fill
- 625 Bedding masonry wall ties
- 630 Fixing timber frame wall ties
- 635 Laying horizontal dpcs
- 640 Laying vertical dpcs
- 645 Laying cavity trays
- 650 Laying gas retardant cavity trays
- 655 Placing full fill cavity insulation
- 660 Placing partial fill cavity insulation
- 665 Forming perpend joint weep holes
- 670 Setting ventilation ducts in cavity walling
- 675 Laying leadwork
- Work to existing walling
- 680 Removing masonry units
- 685 Pocket bonding new walling to existing
- 690 Forming openings in existing masonry
- 695 Installing chemical dpc
- 700 Installing cavity insulation in existing walling
- 710 Repointing masonry walling
In terms of the named “NBS Domestic Specification”, this has been chosen because it has primarily designed with the expectation for use on small domestic projects. Clearly, if anyone thought this content is suitable for one of their simple, small scale, commercial refurbishment projects then they would be welcome to use the service for this.
And finally, here is a picture of an NBS specification product working on an Apple Mac :)
Thursday, 9 September 2010
RIBA Chartered Practice Newsletter - Building Information Modelling (BIM)
Nice to see the shortened version the article Building Information Modelling appearing in the recent RIBA Chartered Practice Newslette:
http://constructioncode.blogspot.com/2010/03/building-information-modelling-bim.html
http://constructioncode.blogspot.com/2010/03/building-information-modelling-bim.html
buildingSMART Summit Week - Day Four
Day one | Day two | Day three
My final day at Denmark was spent at the International Framework for Dictionaries (IFD) Group Workshop. IFD compliments IFC by allowing the creation of detailed international property sets for construction products. The definition of these property sets gives two very clear benefits:
NBS are keen observers of the IFD project and it was fascinating to see these developments and how they are currently being implemented. Jacob Mehus from Standards Norway was the main speaker and the Norwegians are clearly one of the global leaders in this field.
There are three basic rules to those adding content to the IFD library:
Some nice examples of IFD being implemented and used in Norwegian software applications at the moment were presented in the afternoon. SmartKalk is calculation software that allows costs to be added to an IFC model that utilises IFD. The Catenda IFD based knowledge based search is a smart phone application that allows electricians to quickly search regulations in an intelligent way. The search returns give the words context and a list of parts. So if you search for bathroom – you get “wetroom” as a context and “bath”, “mirror”, “shower tray” as suggested parts.
The IFDSignOn project is particularly interesting and is similar in a way to RIBA Enterprises NBS Plus service. This is 30% government funded and it will be used from day one when launched by the Norwegian Defence Agency that clearly has huge purchasing power. It is expected that manufacturers will be very keen to get their data into the service. The manufacturer data is matched to the IFD requirements and then the product is specified. This is to be released in 2011.
At the end of the session there was a sharing of developments around the table. Really nice to hear what is happening in countries such as Denmark, New Zealand and The Netherlands.
My final day at Denmark was spent at the International Framework for Dictionaries (IFD) Group Workshop. IFD compliments IFC by allowing the creation of detailed international property sets for construction products. The definition of these property sets gives two very clear benefits:
- The ability for manufacturers to add their product data against these generic definitions. This allows the designer to describe a desired construction product and then to be presented with a list of manufacturer products that comply with this description.
- The ability to translate product descriptions between languages. When a construction team may not all speak the same language then the ability to translate building documentation is vital. For example, the specification could be translated from Norwegian to Danish or from Spanish to Dutch.
NBS are keen observers of the IFD project and it was fascinating to see these developments and how they are currently being implemented. Jacob Mehus from Standards Norway was the main speaker and the Norwegians are clearly one of the global leaders in this field.
There are three basic rules to those adding content to the IFD library:
- Content may only be added for your own country – the experts in their own nation
- All content must have “definition” – for example, this product being described is an ifcwindow
- All data entered must be in International English as well as the author’s native language – this allows the translation aspect of IFD
Some nice examples of IFD being implemented and used in Norwegian software applications at the moment were presented in the afternoon. SmartKalk is calculation software that allows costs to be added to an IFC model that utilises IFD. The Catenda IFD based knowledge based search is a smart phone application that allows electricians to quickly search regulations in an intelligent way. The search returns give the words context and a list of parts. So if you search for bathroom – you get “wetroom” as a context and “bath”, “mirror”, “shower tray” as suggested parts.
The IFDSignOn project is particularly interesting and is similar in a way to RIBA Enterprises NBS Plus service. This is 30% government funded and it will be used from day one when launched by the Norwegian Defence Agency that clearly has huge purchasing power. It is expected that manufacturers will be very keen to get their data into the service. The manufacturer data is matched to the IFD requirements and then the product is specified. This is to be released in 2011.
At the end of the session there was a sharing of developments around the table. Really nice to hear what is happening in countries such as Denmark, New Zealand and The Netherlands.
Wednesday, 8 September 2010
Green Lighthouse Copenhagen - Carbon Neutral Building
Today we were shown around the Green Lighthouse Building. This is Denmark's first "carbon neutral" public building. The roof is tilted at the optimum angle for the sun and the energy generated goes to the heating and the electrics required by the building. A state-of-the-art heat pump system stores energy in an underground reservoir on the hot days, then uses this energy on the cold days. The building meets the 2020 ambitions for zero energy buildings and is expected to receive a gold certificate from the LEED.



The Green Lighthouse Building
All solar panels are hidden from view on the flat roof
Promotional picture from above

Diagram showing the technology behind the building

A nice south facing terrace for your lunch!

The central staircase
buildingSMART Summit Week - Day Three
The third day of the buildingSMART Summit week started at the Copenhagen School of Design and Technology. The first presentation was from Nicklas Ostergaard from the social network BIM site www.BIMByen.dk – this is based on the principles of Twitter/Facebook/LinkedIn of getting people together on the web who are interested in the same subject. The site has many BIM downloads, a wiki area and a discussion forum. After one year, the site already has over 2,000 members of which 200 sign on each day.
The second presentation was from Morten Steffensen from the Danish Authorities (I had met Morten earlier at the week when we sat on the same table at the bips conference dinner). The Danish Authorities are taking BIM seriously and have published a declaration of 10 ICT demands in state construction, these include: (a) Use of a single project extranet, (b) BIM to be used in competition, (c) BIM to be used in construction, (d) Digital tendering and (e) a BIM handed over to owner for FM. These demands are for all state projects, all building projects above 3m DKK. There was discussion as to how this should be enforced. Another project discussed was an automated submission of a BIM model for part of the building regulation approval.
Leon van Berlo from BimServer.org presented an open source BIM Server. This is partly funded by the Dutch government and industry and may be downloaded and customised for free. Leon mentioned that their nearest competitor charges €150,000 per year. IFC is used as the file format for exchange, it includes a free online BIM viewer and has a Revit plug-in that means that you don’t have to do the import/export to IFC each time you change the model.
James Harty from the Copenhagen School of Design and Technology (KEA) gave a very inspiring presentation on BIM. One case study he gave was comparing the Walt Disney Concert Hall that came in five times over budget compared with the Guggenheim Building which through the use of BIM came in 18% under budget. With the Guggenheim project they passed over the BIM at tender and this resulted in very accurate pricing with only a 1% spread across all of the submissions. At KEA they are teaching the students Revit for BIM then Sigma for quantities and then MS Project for scheduling. They then use Navisworks to look at all three through a common BIM. The aim is that the KEA graduates will become some of the BIM managers of the future.
Our time at KEA came to an end with a tour of a recent building built using BIM technologies, the Green Light House Copenhagen. This was the first carbon neutral Danish Authority building built in 2009. See Green Light House Copenhagen blog post for further information and pictures.
On the afternoon Patrick McLeamy chairman of buildingSMART gave a super talk. Patrick was one of the founders of buildingSMART. The focus of the talk was on the importance of BIM in facility management. Patrick stated that $1 spent in design equates to $20 in construction which then turns into $60 in life cycle operating costs. The importance of the BIM getting passed through design to construction to operation was stressed. Building Information Model to Building Assembly Model to Building Optimised Operating Model. BIM, BAM, BOOM! Patrick’s final point was that if you are going to be paid to design-build-operate a large facility for 30 years – you absolutely have to make a good job on the design and the build side of things.
There was a quite memorable quote from Diderik Haug, Statsbygg, Norway to end the day, “It is much easier, quicker and cheaper to fix a clash detection in a BIM than in the concrete on site”.
The second presentation was from Morten Steffensen from the Danish Authorities (I had met Morten earlier at the week when we sat on the same table at the bips conference dinner). The Danish Authorities are taking BIM seriously and have published a declaration of 10 ICT demands in state construction, these include: (a) Use of a single project extranet, (b) BIM to be used in competition, (c) BIM to be used in construction, (d) Digital tendering and (e) a BIM handed over to owner for FM. These demands are for all state projects, all building projects above 3m DKK. There was discussion as to how this should be enforced. Another project discussed was an automated submission of a BIM model for part of the building regulation approval.
The afternoon's venue - a beautiful 150 year old Danish building
Leon van Berlo from BimServer.org presented an open source BIM Server. This is partly funded by the Dutch government and industry and may be downloaded and customised for free. Leon mentioned that their nearest competitor charges €150,000 per year. IFC is used as the file format for exchange, it includes a free online BIM viewer and has a Revit plug-in that means that you don’t have to do the import/export to IFC each time you change the model.
James Harty from the Copenhagen School of Design and Technology (KEA) gave a very inspiring presentation on BIM. One case study he gave was comparing the Walt Disney Concert Hall that came in five times over budget compared with the Guggenheim Building which through the use of BIM came in 18% under budget. With the Guggenheim project they passed over the BIM at tender and this resulted in very accurate pricing with only a 1% spread across all of the submissions. At KEA they are teaching the students Revit for BIM then Sigma for quantities and then MS Project for scheduling. They then use Navisworks to look at all three through a common BIM. The aim is that the KEA graduates will become some of the BIM managers of the future.
Our time at KEA came to an end with a tour of a recent building built using BIM technologies, the Green Light House Copenhagen. This was the first carbon neutral Danish Authority building built in 2009. See Green Light House Copenhagen blog post for further information and pictures.
The panel face questions from the audience during the afternoon session
On the afternoon Patrick McLeamy chairman of buildingSMART gave a super talk. Patrick was one of the founders of buildingSMART. The focus of the talk was on the importance of BIM in facility management. Patrick stated that $1 spent in design equates to $20 in construction which then turns into $60 in life cycle operating costs. The importance of the BIM getting passed through design to construction to operation was stressed. Building Information Model to Building Assembly Model to Building Optimised Operating Model. BIM, BAM, BOOM! Patrick’s final point was that if you are going to be paid to design-build-operate a large facility for 30 years – you absolutely have to make a good job on the design and the build side of things.
The Copenhagen Museum of Arts
There was a quite memorable quote from Diderik Haug, Statsbygg, Norway to end the day, “It is much easier, quicker and cheaper to fix a clash detection in a BIM than in the concrete on site”.
Nice little mention on Planet Vectorworks
The recent enhancements to Annotator, part of the NBS Tools, gets a nice little mention on Planet Vectorworks...
http://planet.vectorworks.net/2010/09/nbs-annotator-now-supports-uk-vectorworks-architect-users/
http://planet.vectorworks.net/2010/09/nbs-annotator-now-supports-uk-vectorworks-architect-users/
Labels:
CAD
Tuesday, 7 September 2010
Ramboll Head Office - Copenhagen
As part of the buildingSMART Summit Week we were given a guided tour of the new Ramboll Head Office building in Copenhagen. We were made really, really welcome, were given a tour and then over a beer and some food their engineers explained to us how they had utilised BIM throughout the project from design, through construction and then will continue to use BIM as part of the facility management. Amazing stuff.
I took some picture on the tour...
I took some picture on the tour...
Logo at the entrance
Breathtaking flights of stairs going through the centre of the building
Grand piano in reception
Maximum use of glass to give light and transparency
The view from the fifth floor
Each meeting room has an IPad displaying the day's schedule
The sun sets to end another day in Denmark
Labels:
BIM
Subscribe to:
Posts (Atom)



















