Some pictures from the day so far below.

The time is now 17:20...

Dave from Turner and Townsend and Ryder Architecture in the background
The NBS contingency start working on the specification and do some coding
Ready for a snooze - Colour Urban Design have worked through the night
Stage B Report issued - Project brief, contacts and whole building performance
Lots of video content uploaded to the NBS website
Engineer and Architect working shoulder to shoulder
Stage C report is uploaded to the site - outline specification
Squint your eyes and it could almost be Las Vegas
The generic objects are swapped for National BIM Library objects - doors, windows and sanitary ware goes in 